User manual TJERNLUND SS2 SIDESHOT (DISCONTINUED VERSION-PRE UC1 UNIVERSAL CONTROL) 8504063 REV B 1199
DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!
If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual TJERNLUND SS2 SIDESHOT (DISCONTINUED VERSION-PRE UC1 UNIVERSAL CONTROL) 8504063 REV B 1199. We hope that this TJERNLUND SS2 SIDESHOT (DISCONTINUED VERSION-PRE UC1 UNIVERSAL CONTROL) 8504063 REV B 1199 user guide will be useful to you.
Manual abstract: user guide TJERNLUND SS2 SIDESHOT (DISCONTINUED VERSION-PRE UC1 UNIVERSAL CONTROL) 8504063 REV B 1199
Detailed instructions for use are in the User's Guide.
[. . . ] B 11/99
TJERNLUND PRODUCTS, INC.
1601 Ninth Street · White Bear Lake, MN 55110-6794 PHONE (651) 426-2993 · (800) 255-4208 · FAX (651) 426-9547 Visit our web site · www. tjernlund. com
MODEL SS2 INSTALLATION INSTRUCTIONS
!Recognize this symbol as an indication of important safety information!
OWNER INSTRUCTIONS, DO NOT DESTROY
!CAUTION: The owner of the SS2 must keep the area around the vent terminal free of snow, ice and debris.
NOTE: MAXIMUM FLUE GAS TEMPERATURES MUST NOT EXCEED 650oF (343O C) MINIMUM TEMPERATURE MUST BE 250O F (121O C) AT VENT SYSTEM INLET.
THESE INSTRUCTIONS ARE INTENDED AS AN AID TO QUALIFIED, LICENSED SERVICE PERSONNEL FOR PROPER INSTALLATION, ADJUSTMENT AND OPERATION OF THIS UNIT. READ THESE INSTRUCTIONS THOROUGHLY BEFORE ATTEMPTING INSTALLATION OR OPERATION. [. . . ] This relay is necessary to eliminate false triggering of the SideShot by circuit checks that are common with solid state controls. Choose the interlock method that best fits your application.
SS2 FACTORY WIRING
TYPICAL OIL JOB SITE WIRING
9
SS2 CONNECTED TO AN R8184G WITH THE APPLIANCE BURNER MOTOR LESS THAN 6. 2 AMPS @ 120 VAC
LADDER DIAGRAM
CONNECTION DIAGRAM
NOTES: The SS2 is normally interlocked with the primary control of the appliance. Wire all other furnace/boiler controls as normally done when conventional venting before continuing. Disconnect power from the appliance before attempting to interlock the SideShot. Separate the Black burner motor wire from the Orange wire of the R8184G. Connect the Black burner motor wire to terminal Y on the SS2 terminal strip. Connect the Orange wire of the R8184G to the O terminal on the SS2 terminal strip. Connect the White wire of the R8184G to the R terminal of the SS2 terminal strip. NOTE: The White wire from the R8184G will also be connected to L2 or B2 as normally done when conventional venting. Connect the Ground to grounding screw in SS2 electrical box.
SS2 CONNECTED TO A 24 VAC THERMOSTAT CIRCUIT
SIDESHOT TERMINAL STRIP
FURNACE TERMINAL STRIP THERMOSTAT TERMINAL STRIP
10
SS2 CONNECTED TO 24 VAC THERMOSTAT CIRCUIT WITH BURNER MOTOR POST PURGE (P/N 950-2043) (USE IN CONJUNCTION WITH DIAGRAM ON BOTTOM OF PAGE 10)
SS2 CONNECTED TO A RIELLO BURNER
SS2 CONNECTED TO A CARLIN CONTROL
11
SS2 WIRED WITH WEIL-MCLAIN WGO, WTGO AND SGO-W WATER BOILERS OR AQUASTAT CONTROLLED BURNERS WITH CARLIN 602002 PRIMARY CONTROL
DRAFT ADJUSTMENT PROCEDURE The SS2 Vent system will properly vent a wide range of BTU/hr. To compensate for different burner capacities, vent connector lengths, types and sizes, it features a draft adjustment located on the back of the venter assembly. Turning this draft adjustment knob clockwise will increase draft and raise the BTU capacity. Turning the knob counter-clockwise will decrease draft and lower the BTU capacity. IMPORTANT: Before proceeding, close all windows, doors and fireplace dampers. Turn on all appliances in the structure that exhaust indoor air such as clothes dryer, exhaust fans, range hoods, bathroom and whole house exhaust fans. Failure to perform the draft adjustment procedure may cause a poor vent system installation possibly resulting in fire, carbon monoxide poisoning, explosion, personal injury or property damage. Insert a stack thermometer into the vent pipe as close as possible to the SS2 inlet. Adjust barometric draft control to the minimum or least draft setting. NOTE: There will be a slight pause between the venter operation and the burner operation. Continuously monitor the over fire draft and adjust the SS2 draft adjustment knob to maintain a reading of -. 02 to -. 03" W. C. . When the flue gas temperature at the venter inlet has stabilized make any final draft adjustment necessary to maintain a reading of -. 02 to -. 03" W. C. . cannot be obtained with the SS2 draft adjustment knob turned fully clockwise, close the burner air shutter until a reading of -. 02" W. C. [. . . ] Model of the Power Venter as shown on the label attached to Power Venter. Name and address of installer and any service agency who performed work on Power Venter. Date of original installation and dates any service work was performed. warrants the components of the SideShot for two years from date of installation. [. . . ]
DISCLAIMER TO DOWNLOAD THE USER GUIDE TJERNLUND SS2 SIDESHOT (DISCONTINUED VERSION-PRE UC1 UNIVERSAL CONTROL) 8504063 REV B 1199
Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual TJERNLUND SS2 SIDESHOT (DISCONTINUED VERSION-PRE UC1 UNIVERSAL CONTROL) 8504063 REV B 1199 will begin.