User manual SOUTHWEST WINDPOWER SKYSTREAM
DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!
If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual SOUTHWEST WINDPOWER SKYSTREAM. We hope that this SOUTHWEST WINDPOWER SKYSTREAM user guide will be useful to you.
Manual abstract: user guide SOUTHWEST WINDPOWER SKYSTREAM
Detailed instructions for use are in the User's Guide.
[. . . ] DWG #-------------------
Proprietary rights are included in the information disclosed herein. This information is submitted in confidence and neither the document nor the information disclosed herein shall be reproduced or transferred to other documents for manufacturing or for any other purpose except as specifically authorized in writing by Southwest Windpower.
REV.
NC
DESCRIPTION
ECO#--
REVISIONS
sectional MonoPole toWeR FoUnDation & installation ManUal
DATE APPROVED
---
For 45 ft (13. 7 m), 55 ft (16. 7 m) & 70 ft (21. 3 m) Sectional Monopole Towers
THESE DIMENSIONS MUST BE OBSERVED
TOP OF ANCHOR BOLT TOP OF WASHER
7. 00" . 38 (17. 8cm 1)
TOP OF PIER
4. 38" . 12 (11. 1cm . 3)
unless otherwise specified dimensions are inches tolerances are : decimals angles . X ± . 1 ± 30 ' . XX ± . 05 . XXX ± . 002 MATERIAL: FINISH: DO NOT SCALE DRAWING
CAD-generated drawing do not manually update APPROVALS
DRAWN R&D PROD EGR MFG QUAL
Southwest Windpower
Flagstaff, Arizona U. S. A.
DATE
01/12/09
T. NC size A sheet 1 of 1
dwg #
scale 1: 8
5
4
3
2
1
Southwest Windpower, Inc. 1801 West Route 66 Flagstaff, Arizona 86001 USA Phone: 928. 779. 9463 Fax: 928. 779. 1485
www. skystreamenergy. com
November 2010 Southwest Windpower, Inc. [. . . ] At this point two full size adults can complete raising the tower by pushing down on the end of the gin pole.
E
NOTES: (CONT. ) 9. MAKE SURE SECTIONS ARE MARKED AS REQUIRED BY INSTRUCTIONS ON SHEET 3 10. LOOK FOR HIGH SPOTS OR BURRS ON THE FEMALE AND MALE SECTIONS, REMOVE IF NECESSARY 11. SWWP RECOMMENDS BUILDING IN HORIZONTAL POSITION, AND THEN CRANE INTO PLACE. USE COMMON DISH DETERGENT TO LUBRICATE THE ENDS OF THE SECTIONS AND ALIGN LONGITUDINAL WELD SEAMS ON ALL TOWER SECTIONS PRIOR TO ASSEMBLY. INSERT 1" BY 2 FOOT LONG MILD STEEL RODS IN HOLES PROVIDED ON INDIVIDUAL SECTIONS OF TOWER. USE COME-ALONG MINIMUM 2 TON CAPACITY CHAIN COME-ALONG IS REQUIRED ON EACH SIDE. DRAW SECTIONS TOGETHER UNTIL DESIGN SLIP LENGTH IS ACQUIRED OR CHAIN COME-ALONG REACHES MAXIMUM STRAIN. REPEAT STEPS 9 -14 FOR REMAINING SECTIONS
·Connecttheginpoletotheliftingtabatthemidsectionofthetowerusing the wire rope cable and shackles provide with the gin pole kit. ·Positionsuitablebracingtosupportthetowertopandkeeptheturbine from contacting the ground after the tower is lowered. The bracing should be located approximately 8 ft (2. 4 m) from the tower top to clear the turbine blades. ·Positionthevehiclesothereisapproximately1-2ft(30-60cm)ofslack in the cable and the vehicle is in line with lowering path of the tower. DETAIL
MILD STEEL RODS SCALE 1:10
F
610 MIN
E
25
D
Sectional Monopole Tower Foundation & Installation Manual, Revision A 17
IMPORTANT!!
D
LONGITUDINAL SEAM WELDS MUST BE ALIGNED WHEN DRAWING SECTIONS TOGETHER
D
·Removethefoundationnutsandwashers. ·Starttheloweringprocessbyhavingtwopeoplelifttheginpoletotake up the cable slack. ·Oncethetowerpassesthe"balancepoint"thevehiclewillbeincontrol of the tower lowering and the individuals at the holding the gin pole should clear the area. ·Notepullingforcethetowerexertsonthevehiclegreatlyincreasesas the tower approaches horizontal.
·Determinetherequiredcablelengthtakingintoaccountthetwoshackles needed to connect the cable to the gin pole and the tower. ·TurnbackthecableoverthethimbleandinstallthefirstU-Boltclipsuch thatthe"U"sectionoftheboltisincontactwiththe"dead"endofthe cable and is approximately 6 in (15 cm) from the base of the thimble. ·Tightenthenutsevenly, alternatingfromonenuttotheotheruntilreaching 30 lb-ft (41 N-m) of torque. ·InstallthesecondU-Boltclipasnearthethimbleaspossible. Aswith the previous U-Bolt clip, tighten the nuts evenly, alternating from one nut to the other until reaching 30 lb-ft (41 N-m) of torque. ·InstallthethirdU-Boltclipmidwaybetweentheotherclipsandtighten the nuts to 30 lb-ft (41 N-m) of torque. ·Applyaloadtothecableequalorgreaterthanthemaximumanticipated load (DO NOT USE THE TOWER AND TURBINE AS THE LOAD) and retighten the nuts to 30 lb-ft (41 N-m) of torque. This step is very important as the cable may stretch and shrink in diameter when a load is applied effectively loosing the U-Bolt clip nuts. [. . . ] SURFACES) DIMENSIONS ARE IN MM TOLERANCES: ANGULAR: MACH 1/2 BEND 1/2 =1 X = . 30 X. X = . 20 X. XX = . 10 X. XXX = . 05 X. XXXX
09/26/2010
Flagstaff, Arizona U. S. A.
TITLE:
INTERPRET GEOMETRIC TOLERANCING PER: ASME Y14. 5M-1994
70-23 TOWER ASSEMBLY
REV
A
MATERIAL
SEE NOTES SEE NOTES 2
DO NOT SCALE DRAWING
SIZE DWG. NO.
NEXT ASSY APPLICATION
USED ON
FINISH
8
SCALE: 1:80 WEIGHT: 1259. 00 kg SHEET 1 OF 5
1
C
3-CMBP-3271-300
A
7
4
3
Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix F: 70 ft (21. 3 m) Tower Assembly 69
8
7
6
5
4
3
2
1
F F
E
E
D
D
C
C
SCALE: 1:6 3-CMBP-3260-01 SHOWN FOR REF ONLY
B
B
A
BREAK ALL SHARP EDGES: . 1 MAX ALL INSIDE CORNERS: . 3 MAX FINISH: MAX. SURFACES) DIMENSIONS ARE IN MM TOLERANCES: ANGULAR: MACH 1/2 BEND 1/2 =1 X = . 50 X. X = . 25 X. XX
UNLESS OTHERWISE SPECIFIED:
DRAWN CHECKED ENG APPR. Q. A.
NAME
JPW
DATE
09/26/2010
Flagstaff, Arizona U. S. A.
TITLE:
584 (23") DIAMETER OF BOLT PATTERN
PROPRIETARY AND CONFIDENTIAL
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF Southwest Windpower. [. . . ]
DISCLAIMER TO DOWNLOAD THE USER GUIDE SOUTHWEST WINDPOWER SKYSTREAM
Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual SOUTHWEST WINDPOWER SKYSTREAM will begin.